Aris Mining Q3 2026: $287M Revenue, $144M Adjusted EBITDA, Cash Builds to $419M
ARIS sits 62% above its 52-week low of $9.553.
Summary
Aris Mining reported Q3 2026 gold revenue of $287 million and adjusted EBITDA of $144 million, with cash of $419 million after $144 million of quarterly capital spending. Guidance was narrowed to the low end of 300,000-350,000 ounces as the Marmato CIP plant targets first gold in December 2026.
Key Events · Earnings and Guidance · ARIS
-
Q3 Revenue $287M at $4,205/oz
Q3 2026 gold revenue was $287 million at an average realized price of $4,205/oz, with 68.4 koz sold; YTD gold sold was 215.3 koz.
-
Adjusted EBITDA $144M, YTD Up 81%
Q3 adjusted EBITDA was $144 million, bringing YTD adjusted EBITDA to $535 million, up 81% from YTD 2025; trailing 12-month adjusted EBITDA reached $702 million.
-
Cash $419M After $144M Capex
Cash stood at $419 million on September 30, 2026 after $144 million of Q3 capital projects, including $86 million at Marmato and $41 million at Segovia; free cash flow after growth capital was negative $50.8 million in Q3.
-
Guidance Narrowed to Low End
2026 production guidance is now targeted at the lower end of 300,000-350,000 ounces; YTD output of 217.3 koz is about 72% of that floor.
Analysis · ARIS · Energy & Transportation
The cash engine funding the Marmato build is the story here: $287 million of gold revenue at a $4,205/oz realized price generated $144 million of adjusted EBITDA, lifting YTD adjusted EBITDA to $535 million, up 81% year over year. Capital projects consumed $144 million in the quarter, including $86 million at Marmato and $41 million at Segovia, yet the company still ended September with $419 million of cash. That spending pace left free cash flow after growth capital negative $50.8 million in Q3 and negative $47.0 million YTD, so the balance sheet, not operating cash flow, is currently bridging the expansion. Guidance was narrowed to the lower end of 300,000-350,000 ounces, with YTD output of 217.3 koz representing about 72% of that floor. Next hard checkpoint: first gold from the Marmato CIP plant, expected in December 2026, followed by a Toroparu PFS targeted for November 2026 and a potential construction decision in early 2027.
How filings like this one have moved
In the 30 days to Nov 17, 2026, 38% of the 3791 measured filings Wiseek scored 7 moved their stock by 5% or more by the next session's close. The median move was 0.00%. These are measured outcomes after filings of this importance, not a forecast for this one.
Measured one observation per ticker per day, after exclusions. Current figures: Filing Impact Tracker · open dataset
At the time of this filing, ARIS was trading at $15.45 on NYSE in the Energy & Transportation sector, with a market capitalization of approximately $3.2B. The 52-week trading range was $9.55 to $23.29. This filing was assessed with positive market sentiment and an importance score of 7 out of 10.