Summary
Aris Mining's first prefeasibility study on Toroparu outlines a 21-year, 5.6 Moz gold mine with a $2.8 billion after-tax NPV and 31.5% IRR at $3,600/oz gold, set against a $1,005 million initial funding requirement and permits still pending.
Key Events · Product Development and Regulatory · ARIS
-
Toroparu PFS Delivers $2.8B NPV
After-tax NPV5% of $2.8 billion and 31.5% IRR at a $3,600/oz gold base case, with payback in 2.2 years from start of operations.
-
5.9 Moz Reserve Over 21-Year Mine Life
Proven and probable reserves of 200.2 Mt at 0.92 g/t for 5.9 Moz contained gold; life-of-mine output of 5.6 Moz gold, 5.3 Moz silver and 235 Mlb copper, with processing running to Year 29.
-
$1,005M Initial Funding Requirement
$1,017 million construction capital plus $102 million contingency and $24 million working capital, less $138 million of WPMI stream funding that depends on WPMI electing to proceed after a final feasibility study.
-
Low Costs: $1,119/oz Cash, $1,494/oz AISC
Life-of-mine average cash cost of $1,119/oz and all-in sustaining cost of $1,494/oz gold at the base case.
Analysis · ARIS · Energy & Transportation
Toroparu now has its first hard economic study, and the scale is large relative to the company: a 21-year mine producing 5.6 Moz of gold at $1,119/oz cash cost and $1,494/oz AISC, with an after-tax NPV5% of $2.8 billion and a 31.5% IRR at $3,600/oz gold. Capital is the catch. Initial funding of $1,005 million is required, and only $138 million of that is covered by the historic Wheaton stream, which is itself contingent on WPMI electing to proceed after reviewing a final feasibility study. Before construction can begin, Aris must also convert its Guyanese permits into a large-scale mining licence (applied August 2026, still under review) and complete an environmental permit variance. Note that this is a PFS, not a feasibility study, and the company says it will only then evaluate a construction decision — so the value is real but not yet funded or permitted.
How filings like this one have moved
In the 30 days to Nov 12, 2026, 47.3% of the 1873 measured filings Wiseek scored 8 moved their stock by 5% or more by the next session's close. The median move was -0.17%. These are measured outcomes after filings of this importance, not a forecast for this one.
Measured one observation per ticker per day, after exclusions. Current figures: Filing Impact Tracker · open dataset
At the time of this filing, ARIS was trading at $15.50 on NYSE in the Energy & Transportation sector, with a market capitalization of approximately $3.1B. The 52-week trading range was $10.66 to $23.29. This filing was assessed with positive market sentiment and an importance score of 8 out of 10.