Skip to main content
ARIS
NYSE Energy & Transportation

Aris Mining Q3 Production Up 16% YTD; Marmato Expansion On Track for Q4 First Gold

Arie Shkolnikov · Analysis by Wiseek AI
More coverage: Gold Mining Stocks · Materials
Sentiment info
Positive
Importance info
7
Price
$16.9
Mkt Cap
$3.515B
52W Low
$8.75
52W High
$23.29
52W Position info
93% above low
Off High info
27% below high
Rel. Volume info
0.7× avg
Market data snapshot near publication time

ARIS sits 93% above its 52-week low of $8.75.

Summary

Aris Mining reported Q3 2026 production of 69.3 koz, bringing YTD output to 217.3 koz (up 16% YoY), with Q3 revenue of approximately $287 million. The Marmato expansion advanced with the Cascabel 3 tailings facility commissioned and first gold from the new CIP plant expected in Q4 2026.


Key Events · Earnings and Guidance · ARIS

  • Q3 Production Up 16% YTD

    Q3 2026 production of 69.3 koz brought nine-month output to 217.3 koz, a 16.4% increase over 186.7 koz in the same period of 2025.

  • Q3 Revenue of $287M

    Q3 gold sales of 68.4 koz at an average realized price of approximately $4,204 per ounce generated approximately $287 million in revenue, with over $972 million on a year-to-date basis.

  • Marmato Expansion Milestones

    The Cascabel 3 filtered tailings facility was commissioned, flotation plant capacity increased to 1,250 tpd, and the 5,000 tpd CIP plant remains on track for first gold in Q4 2026.

  • Strong Cash Position

    Cash balance of $419 million at September 30, 2026, including the final $42 million Marmato construction funding instalment from Wheaton Precious Metals.


Analysis · ARIS · Energy & Transportation

Aris Mining delivered 217.3 koz of gold in the first nine months of 2026, a 16% increase over the prior year, and generated approximately $287 million in Q3 revenue at an average realized price of $4,204 per ounce. The company reaffirmed it is on track to meet the lower end of its 300,000–350,000 ounce 2026 guidance. The Marmato expansion reached a key milestone with commissioning of the Cascabel 3 tailings facility, and the 5,000 tpd CIP plant remains on schedule for first gold in Q4 2026. A $419 million cash balance, including the final $42 million Wheaton Precious Metals construction instalment, provides a strong liquidity position heading into the expansion ramp-up.

How filings like this one have moved

In the 30 days to Oct 7, 2026, 29% of the 1648 measured filings Wiseek scored 7 moved their stock by 5% or more by the next session's close. The median move was -0.62%. These are measured outcomes after filings of this importance, not a forecast for this one.

Measured one observation per ticker per day, after exclusions. Current figures: Filing Impact Tracker · open dataset

At the time of this filing, ARIS was trading at $16.90 on NYSE in the Energy & Transportation sector, with a market capitalization of approximately $3.5B. The 52-week trading range was $8.75 to $23.29. This filing was assessed with positive market sentiment and an importance score of 7 out of 10.

View Main SEC Filing

Price Chart

Share this article

Copied!

ARIS - Latest Insights

ARIS
Sep 30, 2026, 8:08 AM EDT
Filing Type: 6-K
Importance Score:
8
ARIS
Sep 09, 2026, 7:35 AM EDT
Filing Type: 6-K
Importance Score:
8
ARIS
Jul 29, 2026, 4:14 PM EDT
Filing Type: 6-K
Importance Score:
8
ARIS
Jul 29, 2026, 4:11 PM EDT
Filing Type: 6-K
Importance Score:
8
ARIS
May 06, 2026, 5:10 PM EDT
Filing Type: 6-K
Importance Score:
8