Pilot Mine Trench Averages 4.6 g/t Gold; New Zone 1.3 km East Hits 234 g/t Silver
TCVNF has more than doubled off its 52-week low of $0.196 on elevated volume (2.6× avg).
Summary
Tocvan's first pilot-mine trenches at Gran Pilar came in at or above the grades it needs for pilot feed. Main Zone Trench 19 averaged 4.6 g/t Au with individual samples up to 24.4 g/t Au, while Trench 20 averaged 1.4 g/t Au. A new zone 1.3 km east of the pilot area returned 0.8 g/t Au and 100 g/t Ag on average, with silver samples up to 234 g/t Ag — a second mineralized target the company did not previously have in the pilot plan. About 6,000 tonnes from the three trenches is now stockpiled, giving early feed characterization for the planned 50,000-tonne facility, and more trench results are pending. This follows the September 25 release of closed-circuit column leach results showing 75.4-82.3% gold and 49.1-58.0% silver recoveries, which underpin the pilot's targeted 2026 start. For a company of this size, confirmation that near-surface material meets grade expectations is the key de-risking step before pilot production; the open question is whether the pending trenches hold these grades across the wider stockpile.
At the time of this announcement, TCVNF was trading at $0.47 on OTC in the Industrial Applications And Services sector, with a market capitalization of approximately $36.7M. The 52-week trading range was $0.20 to $0.92. This news item was assessed with positive market sentiment and an importance score of 7 out of 10. Source: ACCESS Newswire.