GlobalFoundries Breaks Ground on First Malta Fab, ~$10B Initial Investment
GFS sits 27% above its 52-week low of $32.02 on light trading volume (0.1× avg).
Summary
GF broke ground on the first of two new 300mm fabs at its Malta, New York site, the project it was selected to operate on Oct. 14 under a U.S.-Japan initiative worth up to $21 billion in funding. The first fab carries an initial investment of roughly $10 billion, backed by $570 million in New York State incentives, and is expected to come online in 2029; a second fab of similar size follows as the project advances. Each fab is expected to add about 900,000 300mm wafers of annual capacity, aimed at automotive, industrial and connected infrastructure customers. The two-fab build is projected to create about 27,000 construction and ecosystem jobs and more than 1,000 high-skilled manufacturing jobs in the Capital Region. This is the physical start of a program already disclosed, so the new information is cost, timing and capacity detail rather than a change in the deal itself.
At the time of this announcement, GFS was trading at $40.81 on NASDAQ in the Technology sector, with a market capitalization of approximately $22.4B. The 52-week trading range was $32.02 to $92.55. This news item was assessed with positive market sentiment and an importance score of 7 out of 10. Source: GlobeNewswire.