VAALCO Brings ETSEM-3H Online at 2,000 BOPD, Starts Baobab Phase 5 Drilling
EGY sits 73% above its 52-week low of $3.365.
Summary
VAALCO completed the ETSEM-3H development well in Gabon, now producing at a stabilized 2,000 gross BOPD (1,140 net), and demobilized the rig, marking the end of its Phase 3 campaign. In Côte d'Ivoire, Baobab Phase 5 drilling has begun with batch-setting top-holes; the first producer is expected online near end of 2026, supporting meaningful production growth in 2027. This follows the Q2 restart of Baobab and the $42.4M profit reported in August. The new well adds immediate cash flow, while the Baobab program sets up a multi-well growth runway. Watch for first production from Baobab Phase 5 around year-end.
Updates
· SEC 8-K — The 8-K attaches the press release announcing ETSEM-3H at 2,000 gross BOPD (1,140 net) and Baobab Phase 5 drilling start.
At the time of this announcement, EGY was trading at $5.81 on NYSE in the Energy & Transportation sector, with a market capitalization of approximately $608M. The 52-week trading range was $3.36 to $6.72. This news item was assessed with positive market sentiment and an importance score of 7 out of 10. Source: GlobeNewswire.