OpenAI Locks In 457MW of AMD-Powered Compute Via Tensorwave Deal
AMD has more than doubled off its 52-week low of $188.22 on elevated volume (2.0× avg).
Summary
Tensorwave signed a six-year agreement with OpenAI to deliver 457 megawatts of IT capacity across multiple U.S. data center sites, all powered by AMD Instinct MI455X GPUs. Capacity starts coming online in H1 2027, with full deployment expected by early 2028. This is a concrete, named-customer commitment for AMD's flagship AI accelerator, and it lands right after a Q3 where Data Center revenue nearly doubled and management guided Q4 to roughly $17 billion. It reinforces the demand side of the AI buildout thesis that has driven AMD's re-rating this year, though the revenue is back-end loaded into 2027-2028 rather than near-term. Watch the H1 2027 ramp for confirmation the MI455X volumes ship on schedule.
At the time of this announcement, AMD was trading at $507.17 on NASDAQ in the Technology sector, with a market capitalization of approximately $875.9B. The 52-week trading range was $188.22 to $658.52. This news item was assessed with positive market sentiment and an importance score of 8 out of 10. Source: Reuters.